Engineering Reliable Power Infrastructure

EPC Project

220KV C-V ISTS EPC Transmission Line Project

Concord Construction Pvt. Ltd. is executing a 220KV C-V ISTS EPC Transmission Line Project for GETCO, covering supply, erection, testing, and commissioning with D/C towers, AL-59 conductors, and OPGW cables.

read more
EPC Project

66kV Double Circuit Bhogat–Dwarka Transmission Line Project

Concord Construction Pvt. Ltd. is executing a 66kV D/C Bhogat–Dwarka Transmission Line for GETCO, spanning 43.62 km with ACSR Panther conductors, strengthening coastal Gujarat’s power reliability and connectivity.

read more
EPC Project

220kV LILO of Motipaneli–Sardargadh Line at Proposed Dhank Substation

Enhancing Gujarat’s energy infrastructure, the Dhank 220kV LILO project supports efficient power flow and grid resilience under GETCO’s transmission expansion plan.

read more
TSS Line Project

132kV Asoj–Champaner TSS Line

This 132kV D/C line strengthens power delivery to Champaner TSS, featuring 10.81 km of ACSR Panther conductor and 24F OPGW cable installation.

read more
EPC Transmission Project

EPC Project – 220kV LILO at Kutiyana Substation from Ranavav–Motipaneli and Ranavav–Jetpur Lines

The 220kV LILO project at Kutiyana Substation enhances Saurashtra’s power reliability by interconnecting key transmission lines, improving grid stability, and supporting regional infrastructure growth.

read more
EPC Civil Construction

EPC Civil Project – 220kV Bhalgamda Substation

The 220kV Bhalgamda Substation Civil Project strengthens Gujarat’s power network through modern infrastructure, sustainable design, and reliable construction under Kintech Synergy Pvt. Ltd.

read more
EPC Transmission Line Project

EPC Line Project – 220kV LILO at Veraval Substation

Strengthening Gujarat’s transmission infrastructure, the 220kV LILO project at Mandan Substation links the GPPC–Otha line, improving grid stability, reliability, and operational flexibility for GETCO.

read more
EPC

EPC Project – 66kV Double & Single Circuit Transmission Line at Charadava, Gujarat

Concord Construction is building a 7.5 km 66kV transmission line for Juniper Green Energy, ensuring efficient renewable power evacuation and reliable grid connectivity in Charadava, Gujarat.

read more
EPC

EPC Project – 220kV D/C BECL–Botad Transmission Line

The 220kV BECL–Botad transmission line project spans 94.26 km and is being executed for GETCO to enhance power reliability and strengthen Saurashtra’s regional grid network.

read more
R&M EPC Project

R&M EPC Project – 132kV Switchyard & Transmission Line Reconductoring at Ambuja Nagar

Enhancing industrial power reliability, this R&M EPC project for Adani Cement upgrades a 132kV switchyard and reconductors 12 km of transmission line, ensuring efficient, safe, and sustainable energy delivery.

read more
Substation EPC

220/33 kV Khageshree Substation

A 220/33 kV substation developed to support the Khageshree Wind Power Project, enabling efficient power evacuation and seamless grid integration for enhanced renewable energy reliability.

read more
Transmission Project

220kV LILO Jetpur–Sardargadh

The 220kV LILO Jetpur–Sardargadh project delivered a 6.2 km double- and multi-circuit line at Shapur Substation, enhancing regional transmission capacity and grid reliability.

read more
Transmission Line

220kV Kalavad–Kangasiyali Transmission Line

This project delivered a 57.5 km 220kV double-circuit transmission line, enhancing power transfer, grid stability, and meeting growing demand in Kalavad–Kangasiyali, Gujarat.

read more
Transmission Line

220kV Rerouting – RIL

This project rerouted the 220kV D/C Jamnagar–RIL line near Panna Dam, ensuring uninterrupted power supply while supporting RIL’s infrastructure expansion safely and efficiently.

read more
Wind Power Transmission Line

220Kv Hadala Virva Line

This project executed a 220kV Double Circuit line from GETCO Hadala to Virva Wind Farm, enabling renewable power evacuation with fast-track erection, testing, commissioning, and efficient ROW coordination.

read more
Transmission Line

220KV Nirola to vatka Line

This project delivered a 220kV D/C transmission line from Nirola Substation to Senvion Wind Farm, enabling efficient wind energy evacuation and timely grid integration.

read more
Substation Erection

132kV Gondal–Haripur LILO

A 132kV S/C Gondal–Haripur LILO line of 18.96 km enhancing GETCO’s network reliability, improving load management, and strengthening regional power evacuation at the 220kV Visavadar Substation.

read more
Transmission Line Project

66KV Kotda-Bavishi Line

This 3.15 km 66kV single-circuit line project improved regional power flow, with Concord delivering full supply, erection, liaisoning, testing, and commissioning for Suzlon.

read more
EPC – Transmission Line

220KV M/S opera Wind Pvt. Ltd. Line

This project built a 13.744 km 220kV line from Patan Pooling Substation to Moti Paneli, enabling efficient renewable power evacuation and stable grid integration.

read more
Substation

132kV Junagadh–Talala LILO

An 11.95 km 132kV LILO line improving grid reliability, stabilizing regional power flow, and strengthening GETCO’s transmission network at the 220kV Shapur Substation.

read more
Substation EPC Works

220kV Dhank Substation – Civil & Erection Works

Comprehensive development of the 220kV Dhank Substation, covering civil infrastructure, control buildings, foundations, and erection of all high-voltage equipment, ensuring reliable power transmission and operational readiness under GETCO.

read more
EPC Project

220kV LILO of GPPC–Otha Line at Mandan (Mota Asarana) Substation

Strengthening Gujarat’s transmission infrastructure, the 220kV LILO project at Mandan Substation links the GPPC–Otha line, improving grid stability, reliability, and operational flexibility for GETCO.

read more