Concord Construction Pvt. Ltd. is executing a 220KV C-V ISTS EPC Transmission Line Project for GETCO, covering supply, erection, testing, and commissioning with D/C towers, AL-59 conductors, and OPGW cables.
Concord Construction Pvt. Ltd. is executing a 66kV D/C Bhogat–Dwarka Transmission Line for GETCO, spanning 43.62 km with ACSR Panther conductors, strengthening coastal Gujarat’s power reliability and connectivity.
Enhancing Gujarat’s energy infrastructure, the Dhank 220kV LILO project supports efficient power flow and grid resilience under GETCO’s transmission expansion plan.
This 132kV D/C line strengthens power delivery to Champaner TSS, featuring 10.81 km of ACSR Panther conductor and 24F OPGW cable installation.
The 220kV LILO project at Kutiyana Substation enhances Saurashtra’s power reliability by interconnecting key transmission lines, improving grid stability, and supporting regional infrastructure growth.
The 220kV Bhalgamda Substation Civil Project strengthens Gujarat’s power network through modern infrastructure, sustainable design, and reliable construction under Kintech Synergy Pvt. Ltd.
Strengthening Gujarat’s transmission infrastructure, the 220kV LILO project at Mandan Substation links the GPPC–Otha line, improving grid stability, reliability, and operational flexibility for GETCO.
Concord Construction is building a 7.5 km 66kV transmission line for Juniper Green Energy, ensuring efficient renewable power evacuation and reliable grid connectivity in Charadava, Gujarat.
The 220kV BECL–Botad transmission line project spans 94.26 km and is being executed for GETCO to enhance power reliability and strengthen Saurashtra’s regional grid network.
Enhancing industrial power reliability, this R&M EPC project for Adani Cement upgrades a 132kV switchyard and reconductors 12 km of transmission line, ensuring efficient, safe, and sustainable energy delivery.
A 220/33 kV substation developed to support the Khageshree Wind Power Project, enabling efficient power evacuation and seamless grid integration for enhanced renewable energy reliability.
The 220kV LILO Jetpur–Sardargadh project delivered a 6.2 km double- and multi-circuit line at Shapur Substation, enhancing regional transmission capacity and grid reliability.
This project delivered a 57.5 km 220kV double-circuit transmission line, enhancing power transfer, grid stability, and meeting growing demand in Kalavad–Kangasiyali, Gujarat.
This project rerouted the 220kV D/C Jamnagar–RIL line near Panna Dam, ensuring uninterrupted power supply while supporting RIL’s infrastructure expansion safely and efficiently.
This project executed a 220kV Double Circuit line from GETCO Hadala to Virva Wind Farm, enabling renewable power evacuation with fast-track erection, testing, commissioning, and efficient ROW coordination.
This project delivered a 220kV D/C transmission line from Nirola Substation to Senvion Wind Farm, enabling efficient wind energy evacuation and timely grid integration.
A 132kV S/C Gondal–Haripur LILO line of 18.96 km enhancing GETCO’s network reliability, improving load management, and strengthening regional power evacuation at the 220kV Visavadar Substation.
This 3.15 km 66kV single-circuit line project improved regional power flow, with Concord delivering full supply, erection, liaisoning, testing, and commissioning for Suzlon.
This project built a 13.744 km 220kV line from Patan Pooling Substation to Moti Paneli, enabling efficient renewable power evacuation and stable grid integration.
An 11.95 km 132kV LILO line improving grid reliability, stabilizing regional power flow, and strengthening GETCO’s transmission network at the 220kV Shapur Substation.
Comprehensive development of the 220kV Dhank Substation, covering civil infrastructure, control buildings, foundations, and erection of all high-voltage equipment, ensuring reliable power transmission and operational readiness under GETCO.
Strengthening Gujarat’s transmission infrastructure, the 220kV LILO project at Mandan Substation links the GPPC–Otha line, improving grid stability, reliability, and operational flexibility for GETCO.