Project Overview
Concord Construction Private Limited is executing the 66kV D/C Bhogat–Dwarka Transmission Line Project for Gujarat Energy Transmission Corporation (GETCO) under an EPC contract.
The project involves the supply, erection, testing, and commissioning of a 43.62 km double circuit transmission line on towers using ACSR Panther Conductors, ensuring enhanced connectivity and reliability for power transmission in the coastal region of Gujarat.
Project Snapshot
Client: Gujarat Energy Transmission Corporation (GETCO)
Contract Reference: ACE(P&C)/Contract/E-127/TL/66KV/B-D/988 & 989, Dated 10.07.2024
Project Type: EPC Project
Working Period: 24 Months
Expected Completion Date: 6 March 2026
Route Length: 45.186 KM
Completion Status: 14.97% Completed | 85% Pending
Scope of Work
The project covers the full EPC delivery of a 66kV D/C transmission line between Bhogat and Dwarka, including:
-
Detailed route survey and finalization of alignment.
-
Design, supply, and delivery of ACSR Panther conductors and transmission line towers.
-
Foundation, erection, and stringing of 66kV D/C towers.
-
Testing and commissioning of the complete transmission system.
-
Quality assurance and safety management throughout project execution.
-
Compliance with GETCO technical and environmental standards.
Chalenges
-
Managing logistics and tower erection across long coastal stretches.
-
Addressing foundation challenges due to saline soil and variable terrain.
-
Ensuring work continuity during monsoon conditions and high wind zones.
-
Maintaining coordination between multiple site teams for a long project duration.
Solution
To ensure smooth execution, Concord Construction implemented:
-
Strategic Resource Planning to allocate manpower, machinery, and materials efficiently across sections.
-
Advanced Survey & Foundation Techniques adapted for coastal and saline soil conditions.
-
Phased Construction Scheduling to balance erection and stringing operations.
-
Safety Protocols and Environmental Safeguards in line with GETCO’s best practices.
-
Digital Project Tracking System to monitor progress and mitigate delays.
Success Story
Although the project is in its early stages, Concord Construction has already achieved nearly 15% completion within the first few months, maintaining full compliance with quality and safety standards. Through proactive planning and efficient team coordination, the project is on track to meet its milestones ahead of schedule. The Bhogat–Dwarka Transmission Line will significantly strengthen the regional grid, enhancing power reliability for coastal Gujarat once completed.
Key Highlights
-
EPC turnkey execution ensuring accountability from design to commissioning.
-
43.62 km of 66kV D/C transmission line using ACSR Panther conductors.
-
Robust safety management and environmental compliance.
-
Strong progress achieved despite challenging coastal working conditions.
-
Expected to enhance power stability and connectivity in western Gujarat.