Project Overview
This Engineering, Procurement & Construction (EPC) project for Juniper Green Energy Limited involves the design, supply, installation, testing, and commissioning of a 66kV transmission line for the Charadava Wind Power Project in Gujarat.
The project scope includes construction of 6.451 km of Double Circuit (D/C) and 1.052 km of Single Circuit (S/C) transmission lines on Double Circuit towers, utilizing ECO Panther conductors and OPGW (Optical Ground Wire) cables for communication and protection integration.
Project Snapshot
Client: Juniper Green Energy Limited
Project Type: EPC
Voltage Level: 66kV
Line Configuration: D/C – 6.451 km; S/C – 1.052 km (on D/C towers)
Conductor Type: ECO Panther
OPGW Cable: Included for communication and protection
Location: Charadava, Gujarat
Project Duration: 7 Months
Target Completion: March 2026
Project Status: Ongoing
Scope of Work
-
Detailed engineering and route survey for the 66kV transmission line.
-
Design, supply, and erection of Double Circuit towers with foundation works.
-
Stringing of ECO Panther conductors for enhanced efficiency and reduced line losses.
-
Laying and testing of OPGW cable for SCADA and real-time data communication.
-
Testing, commissioning, and integration of the line with the regional grid network.
-
Compliance with GERC, GETCO, and CEA standards.
Challenges
-
Executing EPC works across wind-farm terrain and rural zones.
-
Maintaining project timelines under monsoon conditions.
-
Ensuring optimum synchronization between Double and Single Circuit sections.
Solution
-
Conducted advanced route optimization and soil investigation to ensure stability and safety of tower foundations.
-
Utilized pre-fabricated tower components to speed up erection work.
-
Employed experienced EPC teams and modern tension-stringing equipment for quality and precision.
-
Integrated OPGW-based communication for improved monitoring and protection coordination.
Success Story
The 66kV Charadava Transmission Line project will play a vital role in evacuating renewable power from Juniper Green Energy’s wind farm to the state grid, enabling sustainable energy transmission with minimal losses.
Once completed, the project will enhance grid reliability, support Gujarat’s renewable power goals, and strengthen the green energy network of Juniper Green Energy Limited.
Key Highlights
-
66kV transmission line – total length 7.503 km (D/C + S/C).
-
Constructed on Double Circuit towers for operational flexibility.
-
ECO Panther conductors and OPGW ensure efficient and smart grid connectivity.
-
Strengthens wind power evacuation infrastructure in Charadava region.
-
Executed by Concord Construction Pvt. Ltd. under strict safety and quality standards.